{"id":773,"date":"2013-05-12T10:08:32","date_gmt":"2013-05-12T04:08:32","guid":{"rendered":"http:\/\/www.bartabangla.com\/english\/?p=773"},"modified":"2013-05-12T10:08:32","modified_gmt":"2013-05-12T04:08:32","slug":"pm-calls-for-economic-use-of-gas-electricity","status":"publish","type":"post","link":"https:\/\/bartabangla.com\/english\/pm-calls-for-economic-use-of-gas-electricity\/","title":{"rendered":"PM calls for economic use of gas, electricity"},"content":{"rendered":"<p><b><a href=\"http:\/\/www.bartabangla.com\/english\/wp-content\/uploads\/2013\/05\/hasina-in-brief-02.png\"><img decoding=\"async\" class=\"alignnone size-full wp-image-774\" alt=\"hasina in brief 02\" src=\"http:\/\/www.bartabangla.com\/english\/wp-content\/uploads\/2013\/05\/hasina-in-brief-02.png\" width=\"295\" height=\"143\" \/><\/a><\/b><b>BartaBangla Desk ::\u00a0<\/b>Prime Minister Sheikh Hasina on Sunday urged the people to ensure economic use of gas and electricity and stop misuse to develop the country. \u201cI urge the countrymen to ensure economic use of gas and electricity. Misuse should be stopped. It would help develop our economy,\u201d she said at the inaugural ceremony marking the installation of two million Solar Home Systems and one million Improved Cook Stoves program at Ruposi Bangla Hotel in the city.<\/p>\n<p>Finance Minister AMA Muhith, PM\u2019s Adviser Dr. Tawfiq-E-Elahi Chowdhury, State Minister for Power, Energy &amp; Mineral Resources Muhammad Enamul Huq and World Bank country director Johannes Zutt were present as special guests.<\/p>\n<p>IDCOL executive director and CEO Mahbub Malik gave the welcome address at the function, chaired by IDCOL chairman and ERD secretary Abul Kalam Azad.<\/p>\n<p>Addressing the function, the Prime Minister said that after taking office in 2009, the present government has taken emergency, short, medium and long term plans to revitalize the power sector.<\/p>\n<p>She said 55 power plants have so far been commissioned with total production capacity of 3870 megawatt (MW). At present, the daily average electricity production has reached 6350 MW.<\/p>\n<p>Hasina mentioned that 33 more power plants having production capacity of 5873 MW are now under construction.<\/p>\n<p>\u201cTenders are being floated for another 20 power plants with production capacity of 4699 MW. The process of import of 500 MW power from India is also at the final stage,\u201d she said.<\/p>\n<p>The Prime Minister said that the government has signed an agreement with the Russian Government to set up a Nuclear Power Plant with a view to adding 1000 MW of electricity to the national grid by 2018 and another 1000 MW by 2020.<\/p>\n<p>During the last four years, the government has supplied electricity to some three million new subscribers, she said, adding: \u201cI hope, we\u2019ll be able to increase electricity generation to 7000 MW by end 2013 to meet our election pledges.\u201d<\/p>\n<p>Hasina said that at the time of her taking office in 1996, the production of electricity was 1600 MW only. \u201cAt the end of our tenure, it increased to 4300 MW.\u201d<\/p>\n<p>After taking charge of the government again in 2009, she said it was found that the electricity production came down to 3200 MW only.<\/p>\n<p>\u201cThe BNP-Jamat and caretaker governments have failed miserably in their long seven years\u2019 tenure to produce even a single unit of electricity. Instead, electricity production decreased by 1000 MW during the period. The people then suffered terribly due to frequent load-shedding.\u201d<\/p>\n<p>The Prime Minister said the improved cook-stoves of IDCOL could help the rural women to cook in a clean and healthy environment. Fuel consumption of improved cook-stove is less than conventional stoves. It will play an important role in saving firewood and forests.<\/p>\n<p>She said: \u201cWe\u2019ve decided to install one million improved cook-stoves by 2015 and for this the government is providing necessary support to the service-providers.\u201d<\/p>\n<p>\u201cBesides, we\u2019ve taken up projects for the production of biogas, solar powered irrigation pump and mini-grid system through IDCOL. About 27,000 biogas plants have so far been installed under the project. It enabled the rural people to use biogas for cooking and other purposes. We\u2019ve also started the installation of solar powered irrigation pumps in different areas of the country.\u201d<\/p>\n<p>Hasina hoped that the existing diesel-run pumps and mini-grids of the country will be replaced gradually through solar powered irrigation pumps and mini-grid projects.<\/p>\n<p>She also said that the gas supply has been increased by 500 million cft and the government has started to supply gas for household purposes.<\/p>\n<p>The Prime Minister mentioned that there are many costal areas and remote corners in Bangladesh where it is really difficult give electricity connections.<\/p>\n<p>She said: \u201cWe\u2019ve been supplying solar power in those remote areas. We\u2019ve also taken initiatives to produce biogas in those areas. Some organizations including Infrastructure Development Company (IDCOL) have been implementing programs to achieve our objective.\u201d<\/p>\n<p>Hasina mentioned that IDCOL was established in 1997 and since then, it has been working in the production and distribution of renewable energy.<\/p>\n<p>She said: \u201cAfter taking the responsibility of the government in 2009, we\u2019ve taken long-term programs emphasizing on production and distribution of renewable energy.\u201d<\/p>\n<p>The government has already formulated Renewable Energy Policy and Sustainable and Renewable Energy Development Authority Act, she added.<\/p>\n<p>The Prime Minister said the government has ordered waiver of duties and taxes on the import of solar accessories and channeling of soft loans and grants through IDCOL.<\/p>\n<p>\u201cIt has increased the solar power use manifold. The price of solar home system has been reduced due to the various initiatives taken by the government.\u201d<\/p>\n<p>During the four years of the present government, she said: \u201cWe\u2019ve installed more than 1.7 million solar home systems with production capacity of 100 MW of electricity, which is being used by 10 million rural people. About 30,000 jobs have been created by this programme.\u201d<\/p>\n<p>Hasina said that for the first time in Bangladesh, her government adopted the National Energy Policy in 1996 where they emphasized on the utilization, production and promotion of renewable energy.<\/p>\n<p>\u201cWe were able to attract foreign investment, both in public and private sectors, for the production of electricity. We also increased the revenue earnings by reducing system loss. We restored discipline in the sector.\u201d<\/p>\n<p>She added that the government has decided to form &#8216;Energy Research Council\u2019 to give more importance to the energy sector of the country.<\/p>\n<p>A 3-day exhibition, titled `IDCOL Green Energy Expo 2013\u2019, began today (Sunday) at the Winter Garden of Ruposhi Bangla Hotel. The exhibition will showcase latest renewable energy technologies and activities\/initiatives of key market players. Moreover, the exhibition will be accompanied by a series of seminars on various contemporary topics on green energy.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BartaBangla Desk ::\u00a0Prime Minister Sheikh Hasina on Sunday urged the people to ensure economic use of gas and electricity and stop misuse to develop the country. \u201cI urge the countrymen to ensure economic use of gas and electricity. Misuse should be stopped. It would help develop our economy,\u201d she said at the inaugural ceremony marking<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[14],"tags":[],"class_list":["post-773","post","type-post","status-publish","format-standard","category-national"],"acf":[],"_links":{"self":[{"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/posts\/773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/comments?post=773"}],"version-history":[{"count":0,"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/posts\/773\/revisions"}],"wp:attachment":[{"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/media?parent=773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/categories?post=773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bartabangla.com\/english\/wp-json\/wp\/v2\/tags?post=773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}